Project Description
This is the first project carried out for Drew Construction. Consisting of SFS infill to the steel structure to form full height glazing openings. The walls were then clad with K15 insulation and Fundermax cladding boards in modular narrow widths of differing colours. The fixing method was Sika Tack on to a framework of helping hand brackets and vertical rails designed and supplied by Plastestrip.
The project had it’s challenges, being an adhesive fix system carried out during the early winter. Fortunately we completed before the heavens opened after christmas 2013.