ECDC, Mepal, Cambridgeshire.

Projects.

News.

Project Details

When
Winter – Summer 2026
Products
Pretty Plastics Cladding, Trueline Aluminium Cladding, Hardie Panel, James Hardie rainscreen Cladding, Clayworks Render, Hilti Fire Barriers, Kingspan Insulation, Brackets and Rails
ECDC, Mepal, Cambridgeshire2026-11-24T07:47:00+00:00

Project Description

Working alongside Kier Construction, Eden Facades delivered a complex multi-system façade package for a new-build crematorium, incorporating four distinct external finishes across different areas of the building.

The project combined Pretty Plastic façade tiles, TrueLine aluminium cladding, James Hardie cladding and Clayworks render to achieve the architect’s vision for a distinctive building with a variety of materials, textures and finishes.

While Eden Facades has extensive experience installing a wide range of rainscreen and cladding systems, several materials specified for this project were new to the team. The installation therefore required careful planning, specialist technical input and close coordination with Kier Construction and the wider project team.

The façade solution

The building incorporated four different façade finishes, each selected to achieve a particular architectural appearance.

Pretty Plastics façade tiles – Installed across prominent areas of the building, creating a distinctive textured finish. Made from 100% recycled PVC building waste, including old window frames, gutters, and other construction materials, the tiles offered a more sustainable material choice. Each tile was individually fixed to a supporting rail system.

TrueLine aluminium cladding – Used around the building’s columns, porte-cochère and entrance areas, including the service entrance. Eden Facades proposed the TrueLine system to achieve the architect’s design intent. The 1.2 mm aluminium panels incorporated a secret-fix system, creating a continuous finish with concealed fixings.

James Hardie cladding – Installed across several smaller façade areas and the plant room, using a familiar bracket-and-rail arrangement to achieve the required finish.

Clayworks render – Selected for the external viewing area, introducing a deliberately natural, rustic appearance. The architect specifically requested this finish instead of a more conventional render system.

The underlying façade construction incorporated RJ Facades brackets and rails, Kingspan K15 insulation where specified, and Hilti fire-barrier systems, with the installation details adapted to suit the individual façade materials.

Challenges

One of the most technically demanding aspects of the project was installing the Pretty Plastics cladding, a product Eden Facades had not previously worked with.

Unlike conventional rainscreen cladding, where larger panels can cover significant areas of an elevation, this system consisted of 350 x 350 mm tiles that needed to be individually positioned and secured to the supporting rail system.

This required a different approach to setting out and installation, with additional care needed to achieve consistent alignment and detailing.

The hollow construction of the Pretty Plastics tiles also presented a challenge when detailing the fire barriers. The spaces within the tiles meant that the standard arrangement would not allow the intumescent barriers to expand as intended.

Working with the wider design team and specialist suppliers, Eden Facades developed an installation detail that involved individually infilling the tiles at the relevant fire-barrier locations with a manufacturer-recommended Hilti fire-stopping product. This allowed the required 25 mm gap to be maintained within the fire-barrier arrangement.

George Dogaru, Project Manager at Eden Facades, explains:

“The Pretty Plastics system was new to us, and the main challenge was the fire-barrier detailing. Because the tiles are hollow, we had to infill each tile at the fire-barrier locations to maintain the required gap. It took time, but we worked through the challenges to achieve the finished result.”

Through careful setting out and attention to detail, Eden Facades incorporated the agreed fire-stopping arrangement while achieving the distinctive architectural finish required.

The Clayworks render was another unfamiliar product for the team. During installation, the finish initially appeared uneven in colour, prompting Eden Facades to consult the manufacturer. Clayworks explained that the material needed several weeks to fully cure before developing its intended appearance. Once cured, the render achieved a more uniform finish, providing the natural, rustic appearance the architect specified.

Close collaboration with Kier throughout the programme

Having worked with Kier Construction on other projects, ECDC proved to be another successful collaboration.

Delivering four different façade systems on the same project required ongoing coordination between Eden Facades, Kier Construction, the architect, product manufacturers and other specialist contractors.

In several areas, Eden Facades installed the brackets, insulation and fire barriers before another trade completed the plywood substrate, allowing Eden to return and install the finished interlocking aluminium cladding. This required careful sequencing between trades to maintain progress throughout the programme.

Reflecting on the working relationship with Kier Construction, George said:

“Working on a complex project like this presented challenges, but Kier Construction had a very good team that worked collaboratively with us to achieve positive outcomes. I was very impressed.”

The project team’s willingness to discuss technical challenges, accommodate specialist installation requirements and work collaboratively contributed to the successful delivery of the façade package.

The result

Eden Facades completed its works in July 2026, delivering a distinctive façade package combining four contrasting materials and finishes across the new crematorium.

The project demonstrated Eden Facades’ ability to adapt its installation approach to unfamiliar façade systems, resolve complex technical challenges and work closely with the wider project team to deliver the architect’s design intent.

Need an expert façade subcontractor? Speak to us about an upcoming project by calling 01268 744199 or emailing office@edenfacades.co.uk.

 

Contact us.

Please feel free to contact Eden Facades using the enquiry form below. We’ll soon be in touch.