Project Description
The challenge here was to provide a multi facade through wall construction of over 1,000m² within a tight 16 week program. The building being a matter of a few hundred metres from the coastline meant a requirement for marine environment grade powder coating to all flashings and fixings.
We used our internal design team to produce fully detailed and working drawings in conjunction with Hadley Steel Framing and Plastestrip.
Dedicated installation teams were assigned each element of the build which utilised their specific areas of expertise. This resulted in a smooth and methodical installation and a quality finish, which was commended by both Contractor and Suppliers’ Represenatitives.