Amidst all the recent uncertainty, we’re proud to have secured some exciting new projects, working with both new and existing clients.
Recent Contracts Secured – June 2020
We continue to work with main contractor Berkeley Homes, installing rainscreen cladding to the penthouses at the Bishops Weald development in Horsham. In Maidenhead, we are installing Siberian Larch timber cladding at the Forest Bridge school, working with main contractor Kier Construction.
Projects planned at other schools over the summer feature some of our core disciplines, installing lightweight steel framing (SFS), rainscreen cladding and timber cladding systems.
St James Place, a residential project in the centre of Norwich, is our first major contract for Hill Partnerships, and we very much look forward to starting in the coming months.
St James Place, Norwich
Main contractor: Hill Partnership
Products: EOS lightweight steel framing was specified for this project, which has been designed to accommodate the fixing for any type of façade panelling or curtain walling system, alongside use of Wincro brick tie channels and brick support angle systems.
Scope of work: Lightweight steel framing infill to a multi-storey concrete frame, with loadbearing structure to penthouses. Siniat sheathing board, insulation, brick tie channels and brick support angles.
Sub-contract value: £750k – £1.0m range
When: Summer/Autumn 2020
St Joseph’s School, Bishop Stortford
Main contractor: Kier Construction
Products: The cost-effective Kingspan lightweight steel framing system was used, together with Kingspan insulated panels. The SFS is pre-assembled off site, resulting in the project benefitting from a faster build time.
Scope of work: Lightweight steel framing infill to steel frame, sheathing board.
Sub-contract value: £100k – £250k range
When: Spring/Summer 2020
Kendrick School, Reading
Main contractor: Darwin Group
Products: Created by transforming volcanic rock into façade cladding, sustainable Rockpanel cladding will be used on timber battens, with Wetherby insulated render system.
Scope of work: Rockpanel cladding on timber battens and Wetherby insulated render system on timber battens, both to walls on a timber framed building.
Sub-contract value: £50 – 100k range
When: Summer 2020
Meadowfield School, Sittingbourne
Main contractor: Kier Construction
Products: The FunderMax cladding specified for this project can be customised to accommodate individual building requirements in order to protect the building from weather extremes. Similarly, the Sto Ventec R render only system specified has been designed to suit just about any substrate and provides an outstanding insulation solution.
Scope of work: FunderMax rainscreen cladding and Sto Ventec R render only system, on Sto stainless steel framing system, both to walls in a steel framed SFS infill building.
Sub-contract value: £200 – £300k range
When: Summer 2020
Bumble Bee Barn, Beauchamp Roding, North Essex
Main contractor: Fallon Builders
Products: HardiePlank was specified for this project, offering a durable, low maintenance fibre cement cladding solution. With a flexible, lightweight design and beautiful texture, HardiePlank protects the building as well as being aesthetically pleasing.
Scope of work: A blockwork-built barn conversion, clad in HardiePlank on timber battens.
Sub-contract value: £0 – £50k range
When: Summer 2020
Bishops Weald, Horsham
Main contractor: Berkeley Homes
Products: Both cost-effective and easy to install, cement based Ceramapanel A2 cladding will be used for this project, with 3mm PPC aluminium to the window surrounds providing a durable, weather resistant finish.
Scope of work: Ceramapanel A2 rainscreen cladding to penthouses on a low-rise residential block, with PPC aluminium window surround feature.
Sub-contract value: £100 – £200k range
When: Summer/Autumn 2020
Forest Bridge School, Maidenhead
Main contractor: Kier Construction
Products: Fire retardant treated Siberian Larch cladding was specified for this project, one of the most durable timbers available and which improves aesthetically with age. It will be installed on rainscreen brackets and rails.
Scope of work: Timber cladding to walls.
Sub-contract value: £200 – £300k range
When: Summer/Autumn 2020
Whitfield Aspen School, Dover
Main contractor: Darwin Group
Products: The Wetherby Epsitec insulated render system is ideal for timber frame projects, providing a flexible, high impact finish. It was specified for use on this project, together with the Eurobrick brick slip system, a cost effective method of achieving a real brick finish.
Scope of work: Wetherby Epsitec insulated render system on timber battens and Eurobrick brick slip system, both to walls of a timber framed building.
Sub-contract value: £50 – 100k range
When: Summer/Autumn 2020